4Excavation & Strip Foundations – Plots 1–12
Mass excavation to reduced levels, strip foundation trenches, removal and disposal of spoil to plots 1–12
Foul & Surface Water Drainage Installation
Lay 110mm foul drainage runs, 160mm surface water drainage, inspection chambers and connections to mains sewer
Hardcore Fill, Compaction & Blinding
Supply and lay 150mm compacted MOT Type 1 hardcore with 50mm sand blinding to all ground floor slabs
Groundworks Materials – Concrete, Hardcore & Drainage
Ready-mix concrete C25/30 (18m³), MOT Type 1 hardcore (60 tonnes), 110/160mm drainage pipes, inspection chambers and fittings